top of page

Case Studies
Looking at the process and the final product differs from just seeing it online
Brasenose College
Case Study #
20
Architect:
Bermann Guedes Stretton
Heating System:
Main Contractor:
F.G. Alden Ltd
Load Bearing Surface:
Category of Building:
Commercial
Construction ID:
IDEAL ECO / Between Joist
Screed Replacement Tile
ECO-BJ2U / ECO-40G

External view of the medieval hall at Brasenose College.

The floor of the medieval dining hall showing a slightly raised dais.

The existing floor was a combination of an old solid floor and old timber floors.

Height available for the heating system and finished floor was approx. 85mm.

A layer of sharp sand was installed.







bottom of page