Gassiot House, St. Thomas' Hospital

Case Study #

27

Architect:

BMJ Architects

Heating System:

Main Contractor:

ME Construction

Load Bearing Surface:

Category of Building:

Commercial

Construction ID:

IDEAL EPS / LevelDek / System Castellated

Screed Replacement Tile

EPS-40U

What was originally an external courtyard was to be transformed into a new outpatient centre.

With previous experience of the JUPITER product range and a very tight program the contractor elected to use the IDEAL EPS system with the Screed Replacement Tile as substrate.

The Primary insulation and underfloor heating panels were installed within 1 week.

Installation of the 465m² Screed Replacement Tile took just under two weeks - drying time 1 day.

Once installed, the Screed Replacement Tiles were levelled with a latex compound in readiness to accept the vinyl floor finish.

The completed new out patient centre with vinyl floor finish.