Gassiot House, St. Thomas' Hospital
Case Study #
27
Architect:
BMJ Architects
Heating System:
Main Contractor:
ME Construction
Load Bearing Surface:
Category of Building:
Commercial
Construction ID:
IDEAL EPS / LevelDek / System Castellated
Screed Replacement Tile
EPS-40U

What was originally an external courtyard was to be transformed into a new outpatient centre.

With previous experience of the JUPITER product range and a very tight program the contractor elected to use the IDEAL EPS system with the Screed Replacement Tile as substrate.

The Primary insulation and underfloor heating panels were installed within 1 week.

Installation of the 465m² Screed Replacement Tile took just under two weeks - drying time 1 day.

Once installed, the Screed Replacement Tiles were levelled with a latex compound in readiness to accept the vinyl floor finish.

The completed new out patient centre with vinyl floor finish.