top of page

Construction ID - NEO19-30

Carpet / tile / timber / laminates / synthetics

Liquid anhydrite screed

System IDEAL NEO19 240 kPa

UDL

2.0 kN/m²

Anhydrite screed

Construction height

System foil

JUPITER IDEAL NEO 19

Floor finish

Perimeter insulation

Moisture barrier (if required)

19mm

35mm

Perimeter support batten (optional)

54mm

Technical Data

Construction suitable for rooms with restricted ceiling height

Construction height

mm

54

Height excluding floor finish

Mass

kg/m²

~70

Mass excluding floor finish

Thermal resistance, R-value

m²K/W

0.51

.zip includes:

.PDF

NBS Spec

.DWG

Uniform Distributed Load (UDL)

Point load (≥ 20cm²)

Impact sound reduction

Area of application

For refurbishment areas with restricted ceiling where minimum insulation requirements are not required

Additional information

kN/m²

2.0

kN

1.5

dB

-

Construction suitable for rooms with restricted ceiling height but does not comply with the minimum insulation level required on intermediate floors.

 

Should only be used in refurbishment scenarios.

Substrate must be solid, level and flat so that the heating elements can lie flat. Tolerance required as per Surface Regularity 1. (+/- 3mm over 2m)

 

Curing time for light foot traffic: 1-2 days

Drying time at 20°C and 65% RH: 1 day/mm up to 40mm then 2 days/mm.

Dry density: 1950 – 2050 kg/m³