Holy Trinity Church Installation - Timelapse Footage

A recent project undertaken in conjunction with Conservation Architects of Wantage and Classic Buiders of Chalgrove. A combination of floor levelling using our dry slate compound together with Glapor glass aggregate ensured a swift delivery of this project by completely removing the drying-out time that would otherwise have been associated with a limecrete or traditional pipe-in-screed system.


Further information about our ecclesiastical work at our dedicated website www.churchunderfloorheating.com


The Jupiter system was specified for this beautiful church, constructed during the 12th and 13th Centuries. This picturesque church has been used as a backdrop for the television detective series Midsomer Murders, Miss Marple as well as the 2002 film, The Four Feathers.

The interior is pictured shortly before and shortly after the strip-out work had been completed by Classic Builders.

The floor was first levelled, using our dehydrated floor levelling slate. Our slate binds together under loading, and so to keep it pinned firmly in situ, Jupiter installed a layer of Fermacell 2E11. Fermacell boards are non-organic and so will not rot as a layer of plywood might, they are also approximately double as heavy at 23kg/m².


Pictured right, our high compressive strength 30mm thick Ideal EPS heating panels are installed on top of a layer of Kingspan Styrozone insulation on top of the Fermacell boards. These feature rigid aluminium plates that rapidly and evenly diffuse the heat across the floor.

Our unique, tongue-and-groove Screed Replacement Tile system is installed on a slip membrane over the heating panels. The SRT system is bonded together, but not down, forming an inherently decoupled floor that is just as strong as a 65mm thick sand and cement screed. No expansion or movement joints are necessary as the SRT system expands and contracts absolutely minimally across its normal range of operating temperatures.

Jupiter formed a ramp using our dehydrated levelling slate and the Screed Replacement Tile system. Our complete manifold installation incorporating a blending valve and circulation pump is visible on the upper level.

Our tightest pipe centres (125mm centre-to-centre) were used throughout the project to ensure the highest output available was achieved. The size of the footprint to be heated necessitated four manifolds in total.


To take a look at our detailed pipework layout please click below:

Bledlow Pipework Layout
.pdf
Download PDF • 296KB

If you've found this post interesting and would like to discuss a project with us please get in touch.


Also consider subscribing to our newsletter for more stories about our specialist work in sensitively heating listed buildings, and ensuring they are comfortable and fit for use for many more generations to enjoy.

228 views0 comments

Recent Posts

See All
bottom of page